Ponteland Schools and Leisure consisted of single ply membrane and hot melt roofing systems, both of which were successfully installed on time and on budget.
Less foot traffic to roof areas such as the lower curved crescent meant that we chose single ply membrane as our roof covering whilst hot melt was used as a more robust covering to plant locations.
The cladding packages were predominantly a vertically laid standing seam system which then interfaced with horizontally laid sinusoidal cladding.
“Goal Post” features to the cladding at gable ends gave the project the finishing touches.